I did not have time to do any physical work on the engine today. I did however manage to take a look at some of the data taken from Thursday's test run and graph it (shown below).
There are still a number of tasks that remain to be completed before the engine is fully operational:
- Connect Inverter (the battery clips need to be replaced with rings)
- Machine an adapter fitting for the tap (garden hose to 3/4" qualpex)
- Install Labview of the cell computer
- Get a suitably sized load for the inverter (~800 W)
No comments:
Post a Comment